CLUBHOUSE & GYM

Nothing to report at this time.

POOL & POOL DECK AREA

Remove and replace stenner chemical pump feeders accordingly. The #1 stenner pump was dried out and put back in service. The other stenner pump was rebuilt using an old pump and installed the bottom feeder part to put unit back in service. Both stenner chemical feeders are working fine at this time and seem to be dispersing chemicals at the correct levels.

IRRRIGATION

There was no report turned in to us about the irrigation systems. This is unusual and unexpected because of all of the issues that we've been experiencing lately. We await the findings and report from HOOVER on what was found after their inspection of the PS #2 intakes situation? This week we finished our approved July irrigation repairs and our August irrigation inspection. Once the paperwork is completed I’ll be sending the report

To the CDD for approval.

We replace 2 decoders on PS#1 on Clock C.

A mower cut the exposed 2 wire at the end of Clemente and Alex came out and repaired.

Both pump stations and filter rings were inspected and found to be in working order.

LANDSCAPING & LIGHTING

Nothing to report at this time.

PONDS

The monthly pond samples were gathered today, and all of the readings are within the parameters to continue irrigating with these ponds waters, The pond levels are a bit LOW at the present. We can always use more rainfall to help in our irrigation matters,

POND FOUNTAINS

All of the fountains (#!- #6) are operating fine at this time. The fountains at the entrance & exit at Shearwater Parkway needed to be drained, cleaned and put back into service. A new float valve and trigger had to be replaced in the Shearwater Parkway exit fountain. Filled the fountains with fresh water and chemicals as needed, All is well and operating fine now. We continue to wail on a solution to the water supply for the South Patrick entrance and exit fountains.

STREETS & SIDEWALKS

Nothing to report at this time.

GATES & WALLS

An assessment was done on entrance gate at Shearwater Parkway for damages that were done several weeks ago. We are waiting on a report from FDC on the findings of their visit on 8/30/2018

PLAYGROUND

Nothing to report at this time.

OTHER

Nothing to report at this time.