08-16-2019

Randy McGrath

Print Friendly, PDF & Email


FACILITY MANAGER REPORT

08-16-2019

Published: August 16, 2019 3:56 pm

Last Modified: August 17, 2019 9:09 am

Randy McGrath
CLUBHOUSE & GYM

The old carpet was removed from fitness room floor and a new rubberized floor system was installed. although a majority of the scope of work has been completed, the vendor has to come back and install a transition strip to isolate the two separate flooring systems. The floor mats that were used underneath some of the fitness equipment were cleaned and utilized in other areas of the Clubhouse. such as in the front door entranceways and on the pool deck shower area

POOL & POOL DECK AREA

All of the pool water / chemical levels were tested and were spot on.

IRRRIGATION

Montecito 8/16/19

Irrigation inspection clock B and repairsMontecito 8/16/19

Irrigation inspection clock B and repairs
Troubleshooting wiring problems on clock D and clock E (Full report on the wiring with pictures will be sent out next week upon completion)
Thank You
I am also pleased to report that all irrigation zones are operational on clock A, B and C this can be referenced on Insights map that was submitted this week.

Tyler Salas
Thu, Aug 15, 11:49 AM (1 day ago)

All,

This week Insight went back and tested all of the failed zones on clocks A-C and some of the zones with flow “concerns.” Here are the results https://www.easymapmaker.com/map/Montecitocdd.

Zone 54 on clock B, which waters the roundabout in front of the clubhouse, is the only zone on clocks A through C that does not operate from the timer. All other zones are working.

We were not able to test clocks D or E this week since both clocks are shorted. I know Paradise Lawns was on site yesterday searching for the short on clock E. Let us know if there are any questions or concerns.

Thank you for updating the map. I noticed that zone 54 shows as no flow I believe this is because well station 2 provides the water for this zone. Next time you run a test will you try zone 54 on clock B with well station 2.

We are working to resolve the problems on clock D and E rain has been hindering us this Week while working on electrical issues I will notify everyone when they are back up and running. I tried testing zone 54 and watching for flow on Pump station 2. You are correct. It is getting water from pump station 2 somehow. Very strange because it did not used to be that way. Perform Visit 2 of Preventative Maintenance per Contract. Serviced all hydraulic pilot components, flushed
valve, cleaned y-strainer, opened and cleaned reducing and sustaining pilots as applicable, checked valve,
checked speed control and tubing, checked pressure tank, tightened all bolts on skid, tested control panel
logic, tightened all electrical connections in panel and to motor, treated with protectant, checked and
replaced any defective lights and fuses, greased motor (if applicable), rinsed skid, ran system to confirm
proper operation. Work Performed:
Hoover technician Jason performed and observed the following while on site:
--Tech met Randy Mcgrath at the Club House
--checked electrical connections
--checked motor connections
--cleaned Y-Strainers
--added 5 psi to pressure tank to meet design
--ran water through hose bib

Perform Visit 2 of Preventative Maintenance per Contract. Serviced all hydraulic pilot components, flushed
valve, cleaned y-strainer, opened and cleaned reducing and sustaining pilots as applicable, checked valve,
checked speed control and tubing, checked pressure tank, tightened all bolts on skid, tested control panel
logic, tightened all electrical connections in panel and to motor, treated with protectant, checked and
replaced any defective lights and fuses, greased motor (if applicable), rinsed skid, ran system to confirm
proper operation. 
 The Technician performed the work listed above in Nature of Call. Hoover technician Jason performed and observed the following while on site:
--Tech met Randy Mcgrath at the Club House
--checked electrical connections
--checked motor connections
--cleaned Y-Strainers
--added 5 psi to pressure tank to meet design
--ran water through hose bib

LANDSCAPING & LIGHTING

Nothing to report at this time.

LAKES

Nothing to report at this time.

LAKE FOUNTAINS

Nothing to report at this time.

STREETS & SIDEWALKS

Nothing to report at this time.

GATES & WALLS

Nothing to report at this time.

PLAYGROUND

Nothing to report at this time.

OTHER

Both front of the Clubhouse entrance walkways were pressure washed / cleaned and cleaned rubber mats were put into place for anti-slip precautions.

FILE ATTACHMENTS