07-08-2019

Randy McGrath

Print Friendly, PDF & Email


FACILITY MANAGER REPORT

07-08-2019

Published: July 9, 2019 10:48 am

Last Modified: July 9, 2019 10:48 am

Randy McGrath
CLUBHOUSE & GYM

Nothing to report at this time.

POOL & POOL DECK AREA

The pool was vacuumed and mosaic tiles were scrubbed, the filters were cleaned, and the chemicals were checked, the chemical levels are spot on. A new grate was installed on one of the scupper drains as needed on the south side of the pool by the ladder.

IRRRIGATION

Monday July 1st
Resolved a few work orders and capped zone lines for new pool install at 315 point lobos.

Tuesday July 2nd
Repaired main line break located off Clemente.

Wednesday July 3rd
Repaired main line break located off Clemente.
A horizontal irrigation hose was repaired on the South side of the SFH 635 Mission Bay Drive and dirt was installed in the area of the wash-out next to and underneath this home.

LANDSCAPING & LIGHTING

Nothing to report at this time.

LAKES

Nothing to report at this time.

LAKE FOUNTAINS

Nothing to report at this time.

STREETS & SIDEWALKS

Nothing to report at this time.

GATES & WALLS

Both gates at Shearwater entrance and exit were out of range. This created malfunction because the master operators and slave operators were out of sync with one another. This was due to high volume of traffic during the busy 4th of July holiday traffic. Both sets of operators were shut off and cropped in the open position until FDC could come out and check this issue out on Monday July 8th 2019. All gates were checked out as it was time for our preventative maintenance schedule. Shearwaters operators were put back in sync with master and slave operators communicating properly now. Strangely enough this error of the operators did not show itself on the event history of these operators. I believe that these operators became over-heated due to the high traffic volume usage. After speaking to the Tech from FDC who contacted the manufacture service dept./customer care service dept. This could be why this happened to these operators., the boards on the control panel had heated up from the extra usage from traffic volume. All gate are functioning fine at this time.

PLAYGROUND

Nothing to report at this time.

OTHER

Nothing to report at this time.

FILE ATTACHMENTS
IMAGE ATTACHMENTS