07-02-2021

Randy McGrath

Print Friendly, PDF & Email


DISTRICT FACILITIES REPORT

07-02-2021

Published: July 2, 2021 3:29 pm

Last Modified: July 2, 2021 3:29 pm

Randy McGrath
CLUBHOUSE & GYM

Fitness room Closure : It has been scheduled to replace the exsisting flooring in the fitness room with new water-proof vinyl type flooring on July 9,2021.

POOL & POOL DECK AREA

The pool chemicals were tested and checked out spot on, the pool pump is operating at 350 GPM

IRRRIGATION [Updates provided by Insight Irrigation LLC.]

I received a request from Pedro to remove 304 Point Lobos from the irrigation schedules at Montecito while they have a pool screen installed
It has been removed from the watering schedule intil the screen enclosure has been completed, the watering will presume on the regular watering schedule, once enclosure is competed.

LANDSCAPING & LIGHTING

Nothing to report at this time.

LAKES

Water samples were taken from all of the lakes in the Montecito Community and checked the TDS levels. The Artesan wells were also tested and logged.

LAKE FOUNTAINS

Cascade Fountain Company came out yesterday 07-01-21 and performed the regular preventive maintenance to the fountains and the fountain lighting. Continuing waiting for SPIES to schedule repairs for water basin South Patrick Entrance Fountain

STREETS & SIDEWALKS

Nothing to report at this time.

GATES & WALLS

Nothing to report at this time.

PLAYGROUND

Nothing to report at this time.

OTHER

The Damages to the Shearwater entrance pedestal were completed today 07-02-21 by vendor Rogers Stucco & Concrete Repairs.

FILE ATTACHMENTS
IMAGE ATTACHMENTS