DISTRICT FACILITIES REPORT

06-18-2021

Published: June 18, 2021 2:03 pm

Last Modified: June 18, 2021 2:03 pm

Randy McGrath
CLUBHOUSE & GYM

The A/C filters were changed out and commercial grade vinigar was poured down the drain pipes to clear the drains of sluge type contaminants. Inspect the float switches for smooth operation and any drainage type issues. All checked out A-Okay.

POOL & POOL DECK AREA

The pool shower valve assembly was worn out and in need of replacement. Locate, pick up, and installed a new new sping loaded water control valve to the exterior pool shower. There has been an excess of NATS infestation this year at the pool, and the dead NAT-FLIES have been gathering up in the pool equipment filtration grids, along with the sun block, sun tan lotions which gather together and cause blockage of the pool circulation capacity FLOW. The pool chemicals are spot on and the pool pump is operating at 350 GPM. The water levels in the pool needed to be lowered twice this week due to rainfall.

IRRRIGATION [Updates provided by Insight Irrigation LLC.]

Paradise Lawn & Irrigation Company did not turn in a Irrigation report this week.

LANDSCAPING & LIGHTING

Nothing to report at this time.

LAKES

The retension lakes have been increasing somewhat due to the much wecomed rainfall in the late afternoon and early evening hours. Lake Catalina was guaged and measured at 4' 1" 06/18/2021

LAKE FOUNTAINS

All 6 lake fountains and lighting are working fine at this time. The Shearwater Parkway entrance & exit fountains are functioning properly at this time, the South Patrick exit fountain is also functioning fine. however, the South Patrick entrance fountain is having issues with being able to keep water in the reservoir. This fountain gets it's water supply from the irrigation system, however,the irrigation has not been watering due to rain sensor not allowing PS#1 to water because of rainfall triggering the system not to water.

STREETS & SIDEWALKS

Nothing to report at this time.

GATES & WALLS

The Shearwater ParkwayTraffic Gates : The entrance gate half was installed this week by FDC. The master gate controller and the slave gate controller were programmed to work in sync with one another. The gate timer was set up to crop open at 6:00 am. and remain cropped open until 7:00 pm. where it opens and closes after each entrance cycle. Both exit gates were programmed the exact same time frame as the entrance gates. They are to crop open at 6:00 am. and to stay open until 7:00 pm. where it closes after each exit cycle, until 6:00 am. where it crops open once again.

PLAYGROUND

Nothing to report at this time.

OTHER

Nothing to report at this time.