06-14-2019

Randy McGrath

Print Friendly, PDF & Email


FACILITY MANAGER REPORT

06-14-2019

Published: June 15, 2019 10:45 am

Last Modified: June 15, 2019 10:46 am

Randy McGrath
CLUBHOUSE & GYM

The Clubhouse has a booking this Saturday June 15, 2019 from 1:00 pm. to 6:00 pm. (A Baby shower)

POOL & POOL DECK AREA

The posts that used to hold the safety equipment were removed from the flower beds rear of the pool and the safety equipment were relocated and fastened to the East and West return fence areas.

IRRRIGATION

Montecito, controller B
Day 2.
I diagnosed there were multiple shorts along the two wire path and no power going to the zones across from the pump.
I found a broken wire at zones 34, 35. Power is now going across the street. I found there’s shorts across the street zones 36 to 54.
Also located one short within the loop, zones 7 and 8.
Day 3
I replaced the decoder zone 7 and 8. I’ll have to replace the solenoid for zone 7.
Across the street zones 43, 44 and 45.
System Inspection for clock C.
Diagnosing wire issues for clock B. Found the the wire crossing under the road is bad and will need to be replaced.
Went to clock D and found no power to the clock.
Day 5
Repair the main line break caused by another landscaping company.
Diagnose the reason why clock D has now power

The mainline break on Monterey in the back yard has been repaired and paid for by party the did the damage..

LANDSCAPING & LIGHTING

The street light that was not functioning at the Shearwater entrance East side closest to the roadway (Shearwater Parkway) was retrofitted with the new style LED type by Gault Electric Company.

LAKES

The Lakes were treated for vegetation issues (Hydrilla) by American Eco Systems. They will return and retreat in 2 weeks according to laws of the State of Florida that they must have a 2 week grace period between treatments.

LAKE FOUNTAINS

All 6 Lake fountains are working fine at this time.

STREETS & SIDEWALKS

Nothing to report at this time.

GATES & WALLS

FDC came out and checked out the Shearwater entrance gate. I had explained to their tech Paul that I hade tightened down the yoke assembly that had became loose from vibration from the normal chatter gates produce from continuous operation causing the Master and Slave gates to lose one another and throw a malfunction code of (OVER TRAVEL). By tightening the yoke assembly down to its correct position repaired the issue of the gates being out of rhythm (sequence). Paul told me that I had corrected the problem, because he could not get the gate issues to repeat this malfunction. I summoned FDC to make sure that what I had done corrected this problem.

PLAYGROUND

Nothing to report at this time.

OTHER

Nothing to report at this time.

FILE ATTACHMENTS
IMAGE ATTACHMENTS