CLUBHOUSE & GYM

Nothing to report at this time.

POOL & POOL DECK AREA

A new net, / paddles, and balls were purchased in a kit. Retro-fit the net assembly using the old brackets / fastening new net into place, securing hardware at the base of net arms. The super structure of the ping-pong table is in need of replacement, it seems that the outside elements have been eating away at the medal (BADLY RUSTING). A couple of years ago this super structure was primed and painted and this gave us 2 years of extra life of the frame that supports the ping-pong table. This framework has lived / ran out it's life span / replacement is inevitable. I will check out the costs of replaceing the ping-pong table. The Pool chemicals are spot on and the pool pump is operating at 350 GPM. Brevard Pools was supposed to have been here this week to make repairs on one of the pool ladders anchoring wedges, but now have scheduled this scope of work for next weeks schedule. This job is more labor intensive than previously thought, It involves removing pool deck pavers, breaking out existing concrete anchoring materials, and reinstalling new anchoring hardware, resetting into fresh new concrete, / reinstalling the pool deck pavers back into place. This repair was quoted to cost $450.00 from start to finish.

IRRRIGATION [Updates provided by Insight Irrigation LLC.]

I reached out to Paradise Lawn & Irrigation Company to find out what they've done as far as repairs this week, and it was conveyed to me that they're in need of more time in which to familiarize their new Irrigation Manager Mike with his scope of work and proceedures going forward.

LANDSCAPING & LIGHTING

Nothing to report at this time.

LAKES

The interconected Lakes in the Community have reenergized since last weeks rainfall . Lake Catalina has a reading of 4' and all of the lakes water levels have been slightly elevated due to the much welcomed rainfall. We can always use more rainfall (RIGHT)?

LAKE FOUNTAINS

All of the lakes fountains & fountain lighting is operating fine at this time, South Patrick and Shearwater Parkway entrance / exit fountains are functioning fine at this time also.

STREETS & SIDEWALKS

Nothing to report at this time.

GATES & WALLS

FDC has started the fabricating of the damaged entrance gate at Shearwater Parkway and given us a quote of $3582.05 for the new gate half at the Shearwater entrance.

PLAYGROUND

Nothing to report at this time.

OTHER

Nothing to report at this time.