CLUBHOUSE & GYM

We are still waiting for estimates / quotes for different types of flooring to be installed in the fitness room. A popular type flooring system that would be welcomed is the rubberized flooring system is the one that we already have in place in the fitness room, only continuing this flooring system the whole way through the fitness room including the hallway, including transition pieces the restroom, hallway closet, and where the game room tile meets up with the rubberized flooring system in the hallway. New plant-life was purchased and planted & fertilized in the Clubhouse front planters entrances. East side of Clubhouse Shed area planters as well.

POOL & POOL DECK AREA

The pool chemicals are spot on and the pool pump is operating at 350 GPM.

IRRRIGATION [Updates provided by Insight Irrigation LLC.]

The Irrigation system has been temporarilly been shut off, due to the lakes water levels being drawn down below the recomended 3' water levels to all 6 of the interconected lakes, using Lake Catalina as our reference point / benchmark of all of the lakes here in the Community. The Artisan well were half open in order for us to help maintain the water levels of 3'. When we realized that we simply could not maintain the 3' benchmark, the decission was made to shut the irrigation pump stations OFF period, or until we received some or enough rainfall to begin watering once again. The Artisan wells were shut off as well because the TDS levels were getting elevated beyond the recomended irrigating water levels. There is no irrigation repairs report this week from Paradise Irrigation Manager Brandon Detrick because after his return from vacation, he simply made the decission to resign his position at Paradise Lawn & Irrigation. This decission set us all back a step or two, Brandon will be missed and after speaking with Sean Flaherty there will be a new irrigation manager in place by Monday April, 2021.

LANDSCAPING & LIGHTING

Nothing to report at this time.

LAKES

The water levels of all 6 Lakes of the Montecito Community are extremely LOW. We are expecting rainfall on Sunday April 11.2021 50% chance of rainfall is in the forecast for Satellite Beach, FL.

LAKE FOUNTAINS

All 6 fountains and the 6 fountain lighting ststems are functioning fine at this time.

STREETS & SIDEWALKS

Nothing to report at this time.

GATES & WALLS

We are in a holding patern in the arrival of the new gate half assembly in order to have the gates off of Shearwater Parkway entrance functional once again.

PLAYGROUND

The Playground Enhancement Project : is scheduled to be completed on Monday April 12,2021 by William V. and myself Randy McGrath (DFS).

OTHER

Nothing to report at this time.