Streets & Sidewalks

View Right of Ways Capital Improvement Projects

Report Streets & Sidewalks Notes
08-23-2019

Nothing to report at this time.

08-16-2019

Nothing to report at this time.

08-09-2019

Nothing to report at this time.

Addendum for Irrigation 08-02-2019 from Paridise Lawn & Irrigation

Nothing to report at this time.

08-02-2019

There is still concrete cracked and broken around in the area 300 block of Montecito Drive sidewalk where the construction was done when the pool installation took place, on the corner of Monterey Drive and Montecito Drive. It seems that the concrete was poured / but the new sidewalk got damages???

Addendum 07-26-2019

Nothing to report at this time.

07-26-2019

Nothing to report at this time.

07-19-2019

Nothing to report at this time.

07-08-2019

Nothing to report at this time.

06-21-2019

Nothing to report at this time.

06-14-2019

Nothing to report at this time.

06-07-2019

Nothing to report at this time.

05-31-2019

Nothing to report at this time.

05-24-2019

There is a street light out of order at the East entrance of Shearwater parkway closest to the roadway.

05-20-2019 Addendum Irrigation Report

Nothing to report at this time.

05-17-2019

Nothing to report at this time.

04-19-2019

Nothing to report at this time.

04-12-2019

The sidewalks that had been damaged from the construction on Carlsbad Drive have been replaced. The park bench that was purchased for Shearwater Parkway was picked up by William V. and was put together by Randy McGrath. It is fully assembled and ready to be installed once the area that it is to be installed is cleaned up by Paradise Lawn &Irrigation Company.

04-06-2019

Nothing to report at this time.

03-30-2019

Nothing to report at this time.

03-23-2019

Nothing to report at this time.

03-16-2019

: There were 3 street light bulbs installed yesterday 3/15/2019 by Gault Electric Company LLC One at 677 Ventura Drive, One at 239 Montecito Drive, and another at 419 Montecito Drive. All street lights in the community are functioning at this time..:

03-08-2019

Nothing to report at this time.

02-15-2019

Nothing to report at this time.

02-09-2019

Nothing to report at this time.

02-08-2019

: It has been reported, that the sidewalks across the way of the first townhome built on Carlsbad Drive have extremely damaged. There are about 6 five-foot sections of broken and cracked sidewalk from construction equipment traveling over these walkways. It appears that all of this section of walkways will need to be removed and replaced.

02-01-2019

The sidewalks across the street from first townhome on Carlsbad are damaged from the construction equipment . This will need to be replaced

01-25-2019

: All working

01-18-2019

There were 3 street lights not working. One on Carlsbad drive closest to Redondo Drive, there was another bad behind the mail boxes, and one burnt out at 645 Mission Bay Drive. Gault Electric LLC was called out and changed out the three bad LED Bulbs as needed. All lights working now in the Community.

01-04-2019

Nothing to report at this time.

12-21-2018

Street lights: One of the street lights in the new section at Montecito Drive & Carlsbad Drive corner was struck by someone. Unfortunately, we do not know who ran this street light over. Chip Jones the developer has contacted the company who originally did the street light installation to give us a quote on repairs to reset light pole and order a new fixture because although the pole can be reused the fixture is in need of replacement. Waiting on quote.

12-21-2018

Nothing to report at this time.

12-14-2018

It was reported that we have sidewalk lifting taking place at 759 Monterey Drive. This problem was caused by the root system overgrowth of a suspect tree in this concentrated area. A recommendation was made that this tree be removed to resolve this issue.

11-30-2018

There has been a concrete restoration and replacement scope of work being done in the Community by Don Bo Concrete company. I'm not certain if this job has been completed yet. Probably 90% complete as they still have to pour the pad for the Clubhouse storage shed. This pad will be formed up as soon as Brightview completes their scope of work, tree removal, shrub removal, and capping off irrigation line no longer needed.

11-09-2018

Nothing to report at this time.

10-19-2018

The sidewalks TRIP HAZARDS were being addressed today 10-19-2018. The necessary grinding and concrete assessment replacement project is underway. Another Thanks to GMS for staying on task and making things happen to this wonderful Community.

10-12-2018

Nothing to report at this time.

10-05-2018

Nothing to report at this time.

09-28-2018

Nothing to report at this time.

09-21-2018

Nothing to report at this time.

09-14-2018

Nothing to report at this time.

09-07-2018

Nothing to report at this time.

08-31-2018

Nothing to report at this time.

08-24-2018

Nothing to report at this time.

08-17-2018

Nothing to report at this time.

08-10-2018

Gault Electric was here today and replaced one LED light bulb assembly at the Shearwater entrance closest to the gate. They also worked on a street light at Clemente Drive and Sedona Drive., the socket assemble was loosened from wind causing the LED bulb to flicker and not make good connection. reinsert socket assembly and tighten bulb. working fine now.

08-03-2018

Nothing to report at this time.

07-27-2018

Nothing to report at this time.

07-20-2018

Nothing to report at this time.

07-13-2018

The street light at the intersection of Point Lobos Drive and Palos Verde Drive is out of order. This particular street light has been non functional for some time now, as we always prefer to make repairs on street lights when there are 2 or more street lights out of order, because of the costs of the boom truck operations. This being an intersection street light, I believe we must repair now for safety reasons. Unless otherwise instructed, I will contact Gault Electric LLC to schedule this street light to be repaired.

07-06-2018

Nothing to report at this time.

06-15-2018

Nothing to report at this time.

06-08-2018

Nothing to report at this time.

06-01-2018

Nothing to report at this time.

05-25-2018

Nothing to report at this time.

05-04-2018

Nothing to report at this time.

04-27-2018

The pedestrian gate (exit side) at Shearwater Parkway walkway had broken latch and lumber damage. I believe that a gust of wind slammed this door so violently, that it caused these types of damages. I removed the broken timber and broken latch assembly as needed. Replace the wood and latch, painted the complete door on both sides. There is a lifted sidewalk section of concrete as soon as you enter though this pedestrian gate. I spray painted the trip hazard with bright RED paint. This trip hazard will need to ground down in the near future.

04-20-2018
04-13-2018

Nothing to report at this time.

04-06-2018
03-24-2018
03-02-2018
01-19-2018
01-12-2018
01-05-2018