49 results returned.

CIP Status: Complete

Project CIP Category When CIP Funding Estimated Costs Finl Costs
US Flag and Pole Installation at Amenity Center Clubhouse 1st Qtr 2021, 2021 2020/2021 $3,000 $3,000
Replace 2 Sidewalks Right of Ways 2nd Qtr 2020 2019/2020 $2,447
Paint Inside of Perimeter Walls (SFH Section) Perimeter Wall 3rd Qtr 2020 2019/2020 $10,950 $10,950
Painting Inside of Perimeter Walls (North Perimeter Wall) Perimeter Wall 3rd Qtr 2020 2019/2020 $2,035 $2,035
Add North Perimeter Wall Pedestrian Gate Entrances, Perimeter Wall 1st Qtr 2021, 3rd Qtr 2020, 4th Qtr 2020 2019/2020 $6,500 $8,500
Add 10 New Benches throughout the Community Landscaping, Perimeter Wall, Right of Ways 3rd Qtr 2020 2019/2020 $16,000 $15,236
Update Fire Alarm System Clubhouse, Security 2nd Qtr 2020 2019/2020 $16,419 $16,419
Update Clubhouse Access System Clubhouse, Security 2nd Qtr 2020 2019/2020 $8,503 $8,503
Sod Replacement 1 Landscaping 2nd Qtr 2020, 3rd Qtr 2020 2019/2020 $13,794 $13,794
Clean Up Exterior Wall Bench Areas and add Red Crimson Rock Landscaping, Perimeter Wall 2nd Qtr 2020 2019/2020 $3,380 $3,380
Updated Clubhouse Entrance Landscaping Landscaping 2nd Qtr 2020, 3rd Qtr 2020 2019/2020 $9,489 $9,489
Lake Catalina Erosion Control Landscaping 2nd Qtr 2020 2019/2020 $2,735 $2,735
Sod Replacement, Viburnums, Mulch, etc Landscaping 1st Qtr 2020 2019/2020 $5,951 $5,951
Interior Former Pergola Cleanup Landscaping 1st Qtr 2020 2019/2020 $1,035 $1,035
Remove Hedges Around Lake Coquina Landscaping 1st Qtr 2020 2019/2020 $3,600 $8,879
Remove Pergolas Perimeter Wall 1st Qtr 2020 2019/2020 $8,680 $9,335
Paint pedestrian gates and monument trim Perimeter Wall 1st Qtr 2020 2019/2020 $1,650 $1,414
Paint interior side of perimeter wall in townhome section Perimeter Wall 1st Qtr 2020 2019/2020 $4,150 $5,495
Stain exterior clubhouse ceiling areas and clubhouse exterior touchups Clubhouse 1st Qtr 2020, 4th Qtr 2019 2019/2020 $3,850 $3,850
Replace Pump Station #2 Irrigation 4th Qtr 2019, 2019 2019/2020 $58,239 $58,239
Resurface Pool Marcite, Replace Tiles and add LED lights Pool / Pool Deck 1st Qtr 2020 2019/2020 $37,757 $37,757
Roundabout Landscaping Landscaping 2nd Qtr 2018 2017/2018 $10,000 $10,694
Install 2 New Stops (4 Signs) and Paint Crosswalk Right of Ways 4th Qtr 2019 2019/2020 $775 $3,000
Repair Entrance Fountains (Continuance from Previous Year) Perimeter Wall 1st Qtr 2019, 2nd Qtr 2019, 4th Qtr 2018 2019/2020 $3,000 $3,647
Install Bike Racks Outside Pool Area, Playground and Fitness Center Clubhouse, Playground, Pool / Pool Deck 3rd Qtr 2019, 4th Qtr 2019 2019/2020 $2,000 $4,541
Replace Clock D Wiring for all Clock D Zones Irrigation 3rd Qtr 2019, 4th Qtr 2019 2019/2020 $26,400 $26,400
Refurbish and Paint Mailbox Clusters for Redondo and Ventura Right of Ways 2nd Qtr 2019 2018/2019 $3,374 $3,375
Shed Landscaping Landscaping 4th Qtr 2019 2019/2020 $2,130 $2,165
Pool Umbrellas Pool / Pool Deck 3rd Qtr 2019 2018/2019 $2,000 $1,682
Add Security Fence Around Pump Station #3 Security 3rd Qtr 2019, 2019 2018/2019 $2,499 $2,500
Replace Gym Carpet with Rubberized Flooring Clubhouse 3rd Qtr 2019, 2019 2018/2019 $4,199 $4,199
Sidewalk Repair / Shed Pad Clubhouse, Right of Ways 1st Qtr 2019, 2nd Qtr 2019 2018/2019 $8,371 $8,371
Install Storage Shed Clubhouse 1st Qtr 2019, 2nd Qtr 2019 2018/2019 $7,000 $2,934
Repair Entrance Fountains Perimeter Wall 2nd Qtr 2018, 3rd Qtr 2018 2017/2018 $2,700 $6,333
Removal of Shrubbery/Plant Material along inside of Shearwater Perimeter Wall Landscaping, Perimeter Wall 4th Qtr 2019 2019/2020 $8,760 $12,096
Pump Station #1 Undermining Irrigation 2nd Qtr 2019 2018/2019 $9,625 $7,750
Replace Broken Bench #2 Perimeter Wall 2nd Qtr 2019 2018/2019 $1,000 $1,166
Pool Cushion Replacements Pool / Pool Deck 2nd Qtr 2019 2018/2019 $8,200 $8,528
Entrance Planter Updates Entrances, Landscaping 2nd Qtr 2019 2018/2019 $3,760 $3,200
New Pool Area Landscaping Landscaping, Pool / Pool Deck 2nd Qtr 2019 2018/2019 $6,405 $8,914
Upgrade Irrigation Controllers for Online Monitoring Irrigation 1st Qtr 2019 2018/2019 $8,922 $8,922
Add Filtration to Pump Station #3 Irrigation 1st Qtr 2019 2018/2019 $19,906 $19,906
Replace Pump Station #2 Suction Line Irrigation 1st Qtr 2019 2018/2019 $9,608 $9,608
Replace Pump Station #1 Irrigation 1st Qtr 2019 2018/2019 $72,443 $72,443
Exterior Perimeter Wall Painting Perimeter Wall 1st Qtr 2019 2018/2019 $32,400 $24,535
Street Light / Pole Painting Right of Ways 4th Qtr 2018 2018/2019 $3,650 $5,500
Replace Broken Bench #1 Perimeter Wall 3rd Qtr 2018 2017/2018 $1,000 $1,058
Replace Security Camera System Clubhouse, Entrances, Pool / Pool Deck, Security 3rd Qtr 2018 2017/2018 $14,000 $8,795
Entrance Landscaping Entrances, Landscaping 2nd Qtr 2018 2017/2018 $45,000 $34,247