Removal of Shrubbery/Plant Material along inside of Shearwater Perimeter Wall

Larry Bradshaw (Site Admin)

CAPITAL IMPROVEMENT PROJECT DETAIL

Removal of Shrubbery/Plant Material along inside of Shearwater Perimeter Wall

Estimated Costs
$8,760
Final Costs
$12,096
CIP Funding
Project Status
When
Project Description

Current landscaping will be removed in the townhome area along the inside Shearwater Perimeter Wall in preparation for cleaning/repairing/repainting the inside of the wall in townhome area. After wall is painted, sod will be placed in this area.

CIP Category
RECORD LAST MODIFIED: 05/07/20 2:57 pm | Larry Bradshaw (Site Admin)